Residential Projects
A Construction Project of residential units includes following scope of work:
- Conceptual design.
- Detailed drawings & approvals of plans (from authority).
- Excavation & lying of foundation (As per plans)
- Civil Work.
- Plumbing.
- Electrification.
- Sanitation.
- Heating.
- Air conditioning.
- Flooring.
- Washroom & kitchen tilling.
- Wood work.
- Sealing work.
- Hardware fittings.
- Windows.
- Glass work
- Paint work.
- Polish work.
- Metal work.
- Lighting.
- Landscaping.
- Fitting of electrical equipment & other accessories.
Commercial Project
Starting from the excavation of the plot, the process of construction could be discussed in following heads:
- Design & theme planning & approvals of plans.
- Marking & excavation of foundation (as per plan).
- Lying of foundation.
- Brick work / Block work of walls.
- Marking of doors & windows.
- Filling beams for doors & windows (at planned height).
- Brick work again leading to shuttering for linter.
- Making of steel net (as per structure engineer advice).
- Laying electric pipes & points.
- Concrete filling of linter of ground floor.
- Same procedure is adapted for structure of first floor.
- Marking of electric, Heating, A/c, drain & senatorial points.
- Creating groves through grinder for piping inside walls.
- Piping for all required provisions is finalized.
- Plastering of structure.
- Flooring is initiated by the time plaster gets dry.
- Wood work is initiated for the whole structure after marking several cupboards.
- Windows are fixed before starting paint process.
- On inner side of building surfacer (wall filler) is applied to start paint process.
- Wiring is completed & switch plates are installed with covers on.
- Metal work is initiated, for making main gates, grills & stairs etc.
- After completing wood work, polish work is initiated.
- Simultaneously, paint coat are applied.
- Before finalizing the polish & paint, window pans are installed.
- After finalizing paint & polish work, fittings are installed. Electrical, A/C units, Heating units, Senatorial etc.
- Floor polishing starts after this & simultaneously, exterior paints base is made.
- Final paints to exterior are applied & landscaping is started after removing all the debris from the lawns.
- Finally all hardware & kitchen accessories are installed.
All connections & finishes are checked several times to ensure satisfactory results. |