Profile
Approach & Methodology
Role
Construction Project Management
Management Hierarchy
Explore Opportunity
Conceive
Design
Feasibility Analysis
Funds Management
Construction
Quality Measures
Finishes
Scope of Work
Marketing and Sales Strategies
02-20-2009
News & Updates regarding attractive real estates and property
02-20-2009
News & Updates regarding attractive real estates and property
02-20-2009
News & Updates regarding attractive real estates and property
 

Residential Projects
A Construction Project of residential units includes following scope of work:

  • Conceptual design.
  • Detailed drawings & approvals of plans (from authority).
  • Excavation & lying of foundation (As per plans)
  • Civil Work.
  • Plumbing.
  • Electrification.
  • Sanitation.
  • Heating.
  • Air conditioning.
  • Flooring.
  • Washroom & kitchen tilling.
  • Wood work.
  • Sealing work.
  • Hardware fittings.
  • Windows.
  • Glass work
  • Paint work.
  • Polish work.
  • Metal work.
  • Lighting.
  • Landscaping.
  • Fitting of electrical equipment & other accessories.

Commercial Project
Starting from the excavation of the plot, the process of construction could be discussed in following heads:

  • Design & theme planning & approvals of plans.
  • Marking & excavation of foundation (as per plan).
  • Lying of foundation.
  • Brick work / Block work of walls.
  • Marking of doors & windows.
  • Filling beams for doors & windows (at planned height).
  • Brick work again leading to shuttering for linter.
  • Making of steel net (as per structure engineer advice).
  • Laying electric pipes & points.
  • Concrete filling of linter of ground floor.
  • Same procedure is adapted for structure of first floor.
  • Marking of electric, Heating, A/c, drain & senatorial points.
  • Creating groves through grinder for piping inside walls.
  • Piping for all required provisions is finalized.
  • Plastering of structure.
  • Flooring is initiated by the time plaster gets dry.
  • Wood work is initiated for the whole structure after marking several cupboards.
  • Windows are fixed before starting paint process.
  • On inner side of building surfacer (wall filler) is applied to start paint process.
  • Wiring is completed & switch plates are installed with covers on.
  • Metal work is initiated, for making main gates, grills & stairs etc.
  • After completing wood work, polish work is initiated.
  • Simultaneously, paint coat are applied.
  • Before finalizing the polish & paint, window pans are installed.
  • After finalizing paint & polish work, fittings are installed. Electrical, A/C units, Heating units, Senatorial etc.
  • Floor polishing starts after this & simultaneously, exterior paints base is made.
  • Final paints to exterior are applied & landscaping is started after removing all the debris from the lawns.
  • Finally all hardware & kitchen accessories are installed.
All connections & finishes are checked several times to ensure satisfactory results.